Restaurant build-out schedule template

A full-service or quick-service restaurant: underground plumbing, hood & grease duct, health and fire inspections. Answer a few questions about your project and LookAhead builds the whole schedule, with tasks linked, trades assigned and durations sized to your job.

Use this template free
Opens in your browser. No account needed to start; a free account saves up to 3 schedules.
39linked activities at the example size
3.8 monthsto substantial completion at the example size
12trades and parties assigned

What’s in the schedule

  • Preconstruction & procurement
  • Underground
  • Rough-in
  • Finishes & kitchen
  • Inspections & closeout
  • Milestones

Questions it asks

  • Space size (sq ft)
  • Space as delivered
  • Cooking line with hood & grease duct
  • Walk-in cooler / freezer
  • Project name and construction start date

Durations, crew sequencing and the number of floors, buildings or rooms adjust to your answers.

Example size

The numbers above are for this example. Yours change with your answers.

Space size (sq ft): 3,000Space as delivered: Vanilla shellCooking line with hood & grease duct: yesWalk-in cooler / freezer: yes

Trades included

General contractorConcreteFramingMEP (mech / elec / plumbing)Fire protectionInsulation & drywallInterior finishesOwner / tenantTile & stoneKitchen equipmentSignageInspector / agency

How it works

1. Answer the questions

Size, floors, units or scope. It takes about a minute.

2. Review and adjust

Every task is linked, so change one date and the rest follows. Edit anything to match your crews.

3. Print or share

Print a clean schedule or a 2–6 week look-ahead for the field, or send a view-only link to subs and owners.

Durations are planning-level starting points based on typical industry production rates. Review them against your own crews, market and design.

Get the whole schedule in about 10 minutes. Free for up to 3 schedules at a time.

Use this template free

More commercial templates

Office tenant improvement (TI)An interior office build-out in an existing building: demo, framing, MEP, finishes and move-in.
Retail tenant improvementA store build-out from landlord turnover to opening: storefront, signage, fixtures and merchandising.
Medical office build-outClinic or medical office interiors: heavy plumbing, medical gas, X-ray shielding and licensing inspections.